1 November 2011
The ROB was already constructed with steel-concrete composite girders. After construction, there is some problem in the composite superstructure. M/s DSC Limited has engaged M/S Egis India Consulting Pvt. Ltd. as the proof consultants for checking of the designs and working drawings of PSCI Girder superstructure.
more information1 November 2011
Pre-bid (Traffic & Engineering) services for “Four laning of Hospet - Chitradurga section of NH-13 (fromKm299.000 toKm418.600) in the State of Karnataka to be executed as BOT (Toll) Project on DBFOT Pattern
more information1 November 2011
Supervision Consultancy Services for “Installation and Commissioning and Implementation of EFKON's (third party) Toll Collection, Weigh in Motion and Highway Traffic management System at Nagpur Bypass Project in the State of Maharashtra”.
more information1 November 2011
Paradip Port, a primary seaport constructed in 1966 is located in Jagatsinghpur district of Orissa (a state of India). The major activities inside port mainly consist of coal and iron ore.
more information1 November 2011
Independent Engineer for the work of Six Laning of existing three lanes for Bagodara Wataman Tarapur -Vasad Road, SH-8 Km0/0 to Km101/9 in the state of Gujarat on BOT Basis
more information1 November 2011
Pre-bid Consultancy Services for “Four/Six Laning of Raipur-Bilaspur section of NH-200 from Km 0.000 to Km 25+625 in the State of Chhattisgarh
more information1 November 2011
Pre-bid Consultancy Services for “4-Laning of Jabalpur-Rajmarg Crossing Bareli-Bhopal of NH-12 from Km 10.400 to Km 299.714 in the State of Madhya Pradesh under NHDP Phase-III on BOT (Annuity) Basis on DBFOT Pattern
more information1 November 2011
Preparation of Toll Plaza Canopy Architectural & Structural Drawings for Hyderabad Ring Road Toll Plaza @ km 38+100 including Toll Booths & Islands
more information1 November 2011
Pre-bid (Traffic & Engineering) services for “Four laning of Hospet - Bellari - Karnataka Andhra Pradesh Border section of NH-63 (from Km 280.300 to Km 375.740) in the State of Karnataka to be executed as BOT (Toll) Project on DBFOT Pattern under NHDP Phase IV Project
more information1 November 2011
Feasibility for 6 Laning of Chitradurga to Haveri including Chitradurga Bypass (Km 189 to Km 340) of NH4 in the State of Karnataka to be executed as BOT(Toll) Project on DBFO Pattern under NHDP Phase V
more information