• Egis India
  • News
  • Six Laning of existing three lanes for Bagodara Wataman Tarapur -Vasad Road

News

  • 1 November 2011

Six Laning of existing three lanes for Bagodara Wataman Tarapur -Vasad Road

Independent Engineer for the work of Six Laning of existing three lanes for Bagodara Wataman Tarapur -Vasad Road, SH-8 Km0/0 to Km101/9 in the state of Gujarat on BOT Basis

The 3-lane undivided carriageway configuration originates from NH-8A at Bagodara and runs south-eastward through plain terrain through urban settlements of Wataman and Tarapur establishing fairly straight connection with Vasad on NH 8, some 22 km north-west of Vadodara, the cultural capital of Gujarat. The Project Highway bypasses the megacity of Ahmedabad and provides a shorter and preferable route connecting west Gujarat and south Gujarat.