Consultancy Service for Preparation of Detailed Project Report
BCEOM has been assigned the responsibility to prepare the Preliminary Project Report (PPR) and Detailed Project Report (DPR) for 4 preidentified (prioritized) corridors for Bus Rapid Transit Sytem (BRTS) in the city of Bhopal, by Govt. of MP through, Bhopal City Link Limited (BCLL).
The assignment basically comprises (i) Preparing the DPR for Corridor 1 – Misrod to Bairagarh (23.9 km) for which JNNURM fund has been approved by MOUD, GOI; and (ii) Preparing the Feasibility Study Report (FSR) and DPR for Corridoor 2, 3 and 4 (21 km) after approval of FSR.
The detailed Tasks being carried out towards preparation of PPR/FSR and DPR include: Developemnt of Typical Cross Sections for BRTS; BRT System Design (Runningways, Stations, Vehicle, ITS application, Service and Operations Plan); Traffic Surveys and analysis including Public and Para Transport System, and Travel Demand Forecast; Junctions Design; Traffic Safety features, Markings and signages; Engineering Surveys and Highway Design (Road Inventory and condition survey, alignment study, topogtraphical surveys, horizontal & vertical alignment, surveys and investigation of Bridge & Culverts, Improvement proposals); Pavement Design (Pavement composition, widening and reconstruction of existing roads); Utilities and their Relocation Plan; Streetscape and Landscape; Cost Estimates, Bills of Quantities; Preparation of Bid Documents for Contractor.
Preliminary Project Report (PPR) and Detailed Project Report (DPR)
Conducted Traffic and Engineering Surveys under the Supervision of senior staff:
Engineering Concept Plan - Design Criteria and General layout plan prepared with provisions of Bus Station (central platform, bus box etc.)