Bhopal, Madhya Pradesh

PROJET

  • client
    • Bhopal City Link Limited
  • type de prestation
    • Detailed Project Report
  • financeur
    • JNNURM
  • année de référence
    • 2008
  • date de démarrage
    • 01/06/2007
  • date d'achèvement
    • 01/11/2007
  • durée du projet
    • 05 Months

EQUIPE

  • nombre personnel spécialisé fourni
    • 15

PARTENARIAT

  •  

BRTS Bhopal

> Description du projet

Consultancy Service for Preparation of Detailed Project Report

 

BCEOM has been assigned the responsibility to prepare the Preliminary Project Report (PPR) and Detailed Project Report (DPR) for 4 preidentified (prioritized) corridors for Bus Rapid Transit Sytem (BRTS) in the city of Bhopal, by Govt. of MP through, Bhopal City Link Limited (BCLL).

The assignment basically comprises (i) Preparing the DPR for Corridor 1 – Misrod to Bairagarh (23.9 km) for which JNNURM fund has been approved by MOUD, GOI; and (ii) Preparing the Feasibility Study Report (FSR) and DPR for Corridoor 2, 3 and 4 (21 km) after approval of FSR.

The detailed Tasks being carried out towards preparation of PPR/FSR and DPR include: Developemnt of Typical Cross Sections for BRTS; BRT System Design (Runningways, Stations, Vehicle, ITS application, Service and Operations Plan); Traffic Surveys and analysis including Public and Para Transport System, and Travel Demand Forecast; Junctions Design; Traffic Safety features, Markings and signages; Engineering Surveys and Highway Design (Road Inventory and condition survey, alignment study, topogtraphical surveys, horizontal & vertical alignment, surveys and investigation of Bridge & Culverts, Improvement proposals); Pavement Design (Pavement composition, widening and reconstruction of existing roads); Utilities and their Relocation Plan; Streetscape and Landscape; Cost Estimates, Bills of Quantities; Preparation of Bid Documents for Contractor.

> Description des services fournis

Preliminary Project Report (PPR) and Detailed Project Report (DPR)

 

Conducted Traffic and Engineering Surveys under the Supervision of senior staff:

 

  • Traffic and Transportation Studies including - Origin & Destination Survey, Classified Traffic Volume Count, Intersection Turning Movement Count, Boarding and Alighting Survey, Pedestrian Surveys, Public Transport and Passengers Survey, Public/Passenger Opinion Survey, Speed and Delay Studies, Parking Studies, Road Inventory.
  • Engineering Surveys including - Topographic Surveys, Topographic survey for major and minor intersections, Bridge Inventory & Investigation, Pavement Investigation, and Utility Surveys.

Engineering Concept Plan - Design Criteria and General layout plan prepared with provisions of Bus Station (central platform, bus box etc.)

 

  • Developed two Alternative Options for BRT System on proposed corridors based on available RoW with various possible alternative treatments of traffic management, advantages and disadvantages of each cross section developed, LA and R&R cost estimates for the ease of decision-making and to avoid large scale acquisition of land/built-up properties.
  • Existing public and para transport system analyzed and a Public Transport System has been proposed on basis of system parameters and support system viz. user-friendly bus stops, well connected feeder system, priority signal etc.
  • Corridor wise Travel Demand estimates and Forecasting has been done on the basis of planning parameters.
  • Adequate Traffic Engineering and Management measures are being recommended.
  • Proposals and design for widening of roads, intersections improvements, rehabilitation of cross-drainage structures including two new ROBs.
  • Plan, profile and longitudinal section of Highways designed for all four corridors.
  • Alternate pavement design and composition assessed and suitable one adopted as per IRC codes.
  • A Relocation Plan for the utilities is to be prepared.
  • Based on international experience and specific constraints in project area, state-of-the-art elements of BRT System (running ways, Stations, Vehicle, ITS application, Service and Operations Plan- Running time and service levels, Fleet estimation etc.) has been designed for Bhopal.
  • Environmental Impact Study and Environmental Management Plan
  • Social Impact Study and R&R Plan
  • Bills of Quantities and Cost estimates done for – civil works, R&R, shifting of utilities, and environmental cost.
  • Bid Documents (Instructions to applicants, technical specifications, Bill of Quantities, Drawings, Strip plan and Clearances)