Punjab, Himachal Pradesh, Jammu & Kashmir

PROJET

  • client
    • National Highways Authority of India (NHAI)
  • type de prestation
    • Consultancy Service
  • financeur
    • Public
  • année de référence
    • 2005
  • date de démarrage
    • 22/11/2005
  • date d'achèvement
    • 21/05/2008
  • durée du projet
    • 30 months

PARTENARIAT

  •  

    NAG Infrastructure Consulting Engineers (NICE)

Supervision of Upgrading works (4 - lane standards) of NH-1A in Punjab, Himachal Pradesh and Jammu & Kashmir

> Description du projet

Supervision of widening the existing 2 - lane to 4/6 lanes

 

As part of the National Highway Development Programme (NHDP), the National Highway Authority of India provides financing for the supervision of widening works on highways located in the North/South Corridor in the State of Punjab. The scope of work involves strengthening of the existing 2-lane carriageway and widening to 4/6 lanes.

 

More specifically, the purpose is to supervise the development and upgrading of several sections of NH-1A in the State of Punjab to the standards of a 4-lane highway:

· Lakhanpur (Punjab and Jammu & Kashmir border)

· Pathankot section from km 110.00 to Km 117.00 and Km 3.2 to Km 17.00 [ICB Civil Contract package NS-36(PB)],

· Mukerian - Pathankot section from Km 70.00 to Km 110.00 [ICB Civil Contract package NS-37 PB)],

· Bhogpur-Mukerian section from Km 26.00 to Km 70.00 [ICB Civil Contract package NS-38 PB) in the state of Punjab].

Length of the project (km) : From (km) 26.00 to (km) 117.750 & Km.4+00 to Km. 16.350

Cost of civil works (Project cost): Rs.5778 Millions

Contract conditions: FIDIC – General Conditions of Contract.

Technical specifications: MORTH & Special Contract Technical Specifications

Type of pavement: Flexible

> Description des services fournis

Project Management Services

 

In Joint Venture with the local consultant "Nag Infrastructure Consulting Engineer Pvt. Ltd." (NICE), BCEOM was awarded the contract for:

· reviewing contract documents and preparing the formal contract agreement,

· construction supervision for proper implementation of the project within the time schedule,

· review of bituminous mix designs,

· at the commencement of works, approval of the contractor's work programme, resource level and safety precautions, handing over of the site, setting-up of supervisory and quality control systems,

· quality control and certification of interim payments,

· preparation of monthly progress reports,

· preparation of variation orders, as required,

· preparation of as-built drawings,

· preparation of contract completion reports,

· certifying payments in respect of quality and quantity,

· ensuring project planning, monitoring, reporting and financial management,

· reviewing and implementing the safety plan,

· identifying training needs and preparing a training programme,

on-the-job training and training assessment.