India
ARVEE Associates
Detailed Project Report for second ring road Phase 2
The proposed IInd Ring Road (134 km) is towards the development of second Outer Ring Road system around the Hyderabad Metropolitan area to relieve congestion within the city and to act as a catalyst for dispersal of urban growth and to connect major arterial roads of the city including interchanges at NH 7, Vikarabad road, NH 9 at Patancheruvu, NH 7 at Kandlkoi, Karimnagar Highway at Shamirpet, Warangal Highway at Pocharam, NH 9 at Pedda Amberpet, Nagarjuna Sagar highway at Turka Yamzal, Srisailam Highway at Tukkuguda under phase II. The IInd ring road is to be formed in 150m right of ay to urban expressway design standards as a dual four lane carriageway with service roads on either side and provision of railway line. It comprises 5 Nos Partial cloverleaf and 15 Nos. rotary interchanges. A total of 380 structures have been proposed, which include 166 box culverts, 115 slab culverts, 3 ROBs, 40 underpasses, 35 minor and 2 Major bridges.
Desing, Field Studies, Topographic & Traffic Survey
The services shall comprise: