Imphal Water Supply

> Description du projet

Detailed Project Report for Water System

 

The Irrigation and Flood Control Department (IFCD) of Manipur has launched a project to effectively utilise the full potential of Thoubal River as a primary source and supply the treated water to the Imphal city.

The proposed project shall fulfill the objectives in general while preparing the following Utilities:

 

· Augment the supply of water to Imphal city from Thoubal dam.

· Raw water Transmission main.

· Water Treatment Plant.

· Raw & Clear water Pumping stations.

· Proposals for intake works and treatment plant for treating the water to acceptable levels.

Institutional Development.

> Description des services fournis

Design, Estimates, O&M Plan

 

. Existing system analysis

· Field Surveys, Topographic surveys and geo-technical Investigations

· Design, Estimates, BoQ’s of Intake Works and transmission main

· Design, Estimates, BoQ’s of Treatment Plant and master balancing reservoir

· Design, estimates and BoQ for Tunnel for 3 km

· O&M Plan

· Environmental and Social Assessment.