India
Egis BCEOM International and Egis India Consulting Engineers
STUP Consultants Limited
Consultancy Service for NH-8
The Project consisted in widening the existing 2-lane divided carriageway to a 6-lane facility, including the rehabilitation of the existing 2-lane section, from km 273.500 to km. 363.885 on the Jaipur-Kishangarh section of National Highway No 8 on a Build, Operate and Transfert (BOT) basis.
The project is divided into three stages (Design, Construction and Operation & Maintenance):
The salient features of the project are as follows:
- total length: 90.385 km,
- configuration: 2x3-lanes,
- 3 major bridges, 13 minor bridges, 72 culverts,
- 4 interchanges,
- 10 laybys, 44 bus bays
Design, Supervision, Operation and Maintenance
The services provided by the team assigned to the project acting as "Independent Engineer" on behalf of the National Highways Authority of India are as follows:
DESIGN STAGE
CONSTRUCTION STAGE:
Specifications.
OPERATION AND MAINTENANCE STAGE:
Supervision of all maintenance activities including cleaning, replacement of equipment/consumables, roadside facilities, horticultural maintenance and repairs to equipment, pavements, bridges, structures and other civil works.