India

Kolkata, West Bengal

PROJET

  • client
    • Kolkata Metro Rail Corp. Ltd
  • type de prestation
    • General Consultancy Services
  • financeur
    • Public
  • année de référence
    • 2009
  • date de démarrage
    • 02/02/2009
  • date d'achèvement
    • 28/02/2014
  • durée du projet
    • 60 Months

EQUIPE

  • nombre personnel spécialisé fourni
    • 12

PARTENARIAT

  • AECOM, CES, YEC and LHPA

  • nombre hommes/mois
    • 3218
Kolkata East-West Metro alignment

Kolkata Metro Rail Project

> Description du projet

General Consultancy Services for Kolkata East West Metro Rail Project

 

Kolkata East West Metro corridor from Howrah to Salt lake sector V covering a total length of 13.7 kms, partly elevated and partly underground with a critical part going beneath the Hooghly river in Kolkata.

The scope includes providing General Consultancy Services for procurement, project management, construction, testing and commissioning of the complete Kolkata Metro Rail Project, East West Corridor, including all civil engineering structures, tracks, signals, telecom facilities, traction arrangements, air conditioning & ventilation, rolling stock, maintenance depots, stations, operation control centre, offices, station integration areas, bridges, flyovers, elevated, surface and underground sections over the project routes and integration with other modes of transport.

> Description des services fournis

Sub-consultant to Egis Rail

 

Egis India is sub-consultant to Egis Rail and scope includes fielding of local key and support professionals during project implementation including testing commissioning of various systems.