Novelties

14/11/2011

Proof Checking Consultancy for Design of Sarona ROB at Raipur (Chhattisgarh)

The ROB was already constructed with steel-concrete composite girders. After construction, there is some problem in the composite superstructure. M/s DSC Limited has engaged M/S Egis India Consulting Pvt. Ltd. as the proof consultants for checking of the designs and working drawings of PSCI Girder superstructure.

more informations
14/11/2011

Pre-bid (Traffic & Engineering) services for “Four laning of Hospet - Chitradurga section of NH-13

Pre-bid (Traffic & Engineering) services for “Four laning of Hospet - Chitradurga section of NH-13 (fromKm299.000 toKm418.600) in the State of Karnataka to be executed as BOT (Toll) Project on DBFOT Pattern

more informations
14/11/2011

Supervision Consultancy Services at Nagpur Bypass Project

Supervision Consultancy Services for “Installation and Commissioning and Implementation of EFKON's (third party) Toll Collection, Weigh in Motion and Highway Traffic management System at Nagpur Bypass Project in the State of Maharashtra”.

more informations
14/11/2011

Detail Study, Submission of Project Report including preparation of Master Plan for drainage system inside Harbour Area and Port Township Area of Jagatsinghpur.

Paradip Port, a primary seaport constructed in 1966 is located in Jagatsinghpur district of Orissa (a state of India). The major activities inside port mainly consist of coal and iron ore.

more informations
14/11/2011

Six Laning of existing three lanes for Bagodara Wataman Tarapur -Vasad Road

Independent Engineer for the work of Six Laning of existing three lanes for Bagodara Wataman Tarapur -Vasad Road, SH-8 Km0/0 to Km101/9 in the state of Gujarat on BOT Basis

more informations
14/11/2011

Pre-bid Consultancy Services for “Four/Six Laning of Raipur-Bilaspur section of NH-200

Pre-bid Consultancy Services for “Four/Six Laning of Raipur-Bilaspur section of NH-200 from Km 0.000 to Km 25+625 in the State of Chhattisgarh

more informations
14/11/2011

Pre-bid Consultancy Services for “4-Laning of Jabalpur-Rajmarg Crossing Bareli-Bhopal of NH-12

Pre-bid Consultancy Services for “4-Laning of Jabalpur-Rajmarg Crossing Bareli-Bhopal of NH-12 from Km 10.400 to Km 299.714 in the State of Madhya Pradesh under NHDP Phase-III on BOT (Annuity) Basis on DBFOT Pattern

more informations
14/11/2011

Preparation of Toll Plaza Canopy Architectural & Structural Drawings for Toll Plaza

Preparation of Toll Plaza Canopy Architectural & Structural Drawings for Hyderabad Ring Road Toll Plaza @ km 38+100 including Toll Booths & Islands

more informations